Shandong Jikou Minsheng Thermal Energy Co., Ltd. (hereinafter referred to as the "Company") was established in September 2009. It is an energy enterprise mainly engaged in power generation and heat production and supply. The company is a joint venture between Jining Mining Group and Shandong Plastics Industry Group. It is the first gas-fired power generation project in Jining. It has set a good example for the key transformation node of "coal to gas" in Shandong and built a green, efficient, safe and clean heating system.
Based on the working conditions, Eacoon group provided two 50-ton box-type split machines (TG-50-ME-TS-LF) and a series of combustion systems for this project, supporting the 50th steam boiler and 35MW hot water boiler. It only took more than one month to complete the delivery, installation and debugging work. Recently, after the after-sales team patiently solved various complex problems, the project was successfully ignited and NOx emissions were stably controlled within 30 mg/Nm³, which increased The owner’s impression of the energy-saving, low-nitrogen, and environmentally friendly advantages of FIR ultra-low nitrogen new technology ensures that the project actively plays the role of the “Energy Security Center” of Jining New Materials Industrial Park

