• E-GAS 40/70/105/120P
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner

E-GAS (48-120kw) 40/70/105/120P industrial gas burner

No.E-GAS 40/70/105/120P
Eacoon E-GAS 40/70/105/120P industrial gas burner It is a small commercial model burner with a power range between 48-120KW. It uses the European E brand's ignition and burner control system,and  suitable for small steam generators, incinerator, and commercial kitchen etc.
  • E-GAS 40/70/105/120P
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
  • E-GAS 40/70/105/120P industrial gas burner
SPECIFICATION
Starting up the burner
PRELIMINARY CHECKS

Before starting up the boiler check the following: - gas type and feed pressure; - gas valves closed; - the seals ithe pipe fittings:- gas pipe breather and input pressure;-that the cable complies with the diagram and the phaseand neutral wires correspond:- that the burner shuts down when the boiler thermostat opens; - the seal of theboiler furnace which prevents air from entering; - the seal on the flue-boiler pipe fiting; - the condition of thefue (sealed, free from blockage,etc).lf all these conditions are present, start the burner, The control devicestarts the motor to carry out prewashing of the combustion chamber, During this prewash period (about 30seconds) the device checks that air pressure is correct via the air pressure switch. Ar the end. it supplies poweito the transformer and opens the gas valves, The flame must be lit and stabilize within 3 seconds, which is thedevice's safety time limit, Check to ensure the flame is lit before placing any control instrument in the flue.Adjust and check the gas flow necessary for the boiler at the meter, Adjust the air flow according to the gas flowto obtain correct combustion.

IMPORTANT ADVICE
Al adiustable parts must be fixed by the installer after making adjustments. Check flue combustion after eachacjustiment.The CO2 values must be approx. 9.7 (G20) 9.6(G25 11.7 (13B) 11.7 (13P) axld the CO must be less than 75ppm.


Product Paremeter